What the map shows in dry months
- The river is mostly diverted. The PB-CILA pump station, just south of the border, pulls about 15 MGD out of the Tijuana River channel. Its pumps handle up to about 23 MGD4, so when they are working, little sewage crosses the border.
- The diverted water goes down the coast, not to treatment. PB-CILA sends what it catches through Tijuana's Pump Station 1 and down aging pipelines to the San Antonio de los Buenos plant at Punta Bandera.
- Punta Bandera discharges about half of it untreated. The plant treats about 18 MGD, roughly half of what arrives. The rest, about 18 MGD, goes onto the shoreline untreated12.
- The South Bay plant runs at its limit. The U.S.-run plant treats about 35 MGD5, piped over from Tijuana and caught by the border canyon collectors, and sends it out an outfall about 3.5 miles offshore.
Why does Punta Bandera close the beach in dry months?
Ocean currents carry the plume from Punta Bandera north along the coast. Modeling by the Scripps Institution of Oceanography, summarized by the EPA, found that Punta Bandera is the main source of the pollution behind Imperial Beach closures in dry months3. Switch the map to What reaches the ocean to see Punta Bandera's discharge next to the river, the canyons and the treated outfall.
Can the river still close the beach in dry weather?
Yes, when something breaks. In May 2026 the pipeline that carries Tijuana's sewage to the coast collapsed twice, sending tens of millions of gallons into the river and forcing PB-CILA to shut down. EPA says the pipeline's rehabilitation was completed in August 20266. Failures at Tijuana pump stations also send more sewage to the border canyon collectors.
What would change the dry-season picture?
A U.S.–Mexico working group set up under Minute 333 is studying an offshore outfall for Punta Bandera and an expansion of the plant to about 43 MGD. Neither is funded yet2. The rainy season map shows what changes when storms arrive.
Sources
- The Coronado News, the mayor's corner on Punta Bandera treating about half its inflow, August 2026
- U.S. EPA, Minute No. 333, on current capacity and the expansion study
- U.S. EPA, Beach Impact Comparison Study — the Scripps modeling of beach-closure sources
- IBWC planning summary, on when the PB-CILA pumps shut off
- IBWC, South Bay plant capacity raised to 35 MGD, August 2025
- U.S. EPA, Tijuana River watershed public updates, on the May 2026 collapses